Buildings
Verification and Handover is a must-pass Green Star credit, and most teams get caught out on the evidence, not the design. The metering, the alerts and the 12 months of tuning are all achievable on their own. The catch is proving each one, in a form an assessor will accept, usually right when the deadline is closest. This guide walks through what you actually have to prove, where projects tend to fall down, and how BraveGen builds the evidence as the project runs, so nothing has to be reassembled at the end.